Fig. 2

Dose comparison between planned (filled square) and estimated delivered (open square) dose to planning target volume (PTV) and their standard deviations: minimum (Dmin), mean (Dmean), maximum dose (Dmax) to the PTV, and the dose delivered to the 95% volume of the PTV (D95%)